EngineeringGeological EngineeringPetroleum EngineeringHydraulic EngineeringHydraulic FracturingUnconventional ReservoirsFracture PropagationNear-wellbore EffectsProppant TransportFracture ClosureGravel PackingNear-wellbore FlowProppant FlowbackProppant SettlingProppant Settling BehaviorProppant Settling VelocitySettling
Forced closure, or perhaps better-named ``reverse gravel packing,`` of fractures immediately following hydraulic fracturing with proppant and gelled fluids is a technique which, with rare exception, can be extremely beneficial to the success of almost every hydraulic fracture treatment. By proper planning of the rig-up to allow immediate flow-back, substantial quantities of polymer and load fluid can be removed while simultaneously negating undesirable proppant settling within fractures in the near wellbore area. Fracture smearing (dilution of proppant into an extending fracture) after shutdown can be negated. And in most cases, proppant production from the formation can be reduced. Discussions in the article explain why Ely and Associates has the confidence to make these claims after extensive hydraulic fracturing experience in many geographical areas.