Research Journal of Applied Sciences Engineering and Technology · 2014 · 127 citations · 10 references
ArchitectureConstruction ManagementProject ManagementBuilding Information ModelingConstruction EngineeringConstruction Project ManagementBim CoordinationConstruction MethodsConstruction PlanningBarriersBim Adoption ManagementBim Implementation PlanningBim Implementation StrategyBim-based CollaborationBuilding Information Modeling (Bim) IntegrationConstruction
Building Information Modeling (BIM) is a new approach of construction design. It does not only facilitate the digital representation for designs but also provides all the necessary information for any project before it is constructed. Despite this advantage, the adoption of BIM in Malaysian construction is very low. Motivated by this, current study has focused on assessing current status of BIM implementation in Malaysian construction industry. It has also investigated advantages and disadvantages together with barriers to implementations of BIM and proposing effective strategies for enhancing the BIM implementation in construction industry. Investigation was done through survey where 150 questionnaire forms were distributed and 95 completed forms received back were analyzed with Average Index (AI) and Relative Importance Index (RII) method. Findings of the study revealed that the rate of BIM implementation in construction industry is very low. Major advantages of BIM are improved scheduling, improved drawing coordinated, controlling time and cost and singe detailed model. Enhanced collaboration, requires coordinated drawing, interoperability are the major disadvantages and limitations of BIM. Major barriers to low level of BIM implementation are lack of competent staff to operate the software, unawareness of the technology and non availability of parametric library. Provision of trial software, training of construction staff and introducing of BIM in university curriculum are very effective strategies in enhancing the implementation of BIM.
10
Preliminary Study on Causative Factors Leading to Construction Cost Overrun
Aftab Hameed Memon, Ismail Abdul Rahman, Ade Asmi Abdul Azis · International Journal of Sustainable Construction Engineering and Technology (Universiti Tun Hussein Onn Malaysia) · 2011 · 128 citations · Full text
Architecture, Construction Management, Project Management +10
Review of the Development and Implementation of IFC compatible BIM
Arto Kiviniemi, Jan Karlshøj, Väino Tarandi et al. · 2008 · 94 citations
Architecture, Construction Management, Industrial Engineering +10