Ghent University Academic Bibliography (Ghent University) · 2008 · 32 citations · 0 references
PlanningInfrastructure PlanningInfrastructure FinanceInfrastructure PolicyTransportationBroadband PolicyCommunication NetworksInfrastructure SpendingNetwork Capacity PlanningTelecommunications PolicyTransportation EconomicsDescriptive Case StudyFiber Optic Network ExpansionInfrastructure CostsNetwork Cost FunctionsNetwork Design Cost AnalysisNetwork Infrastructure InvestmentOptical Access NetworksTotal Annualized Cost
Fibre is generally believed to be the last step in the evolution of the access network. Currently most telecom operators are reluctant to deply FTTH in the access networks as this is very costly. Most operators are also averse to the risk of regulation - unbundling of the local loop - the new fibre infrastructure. We present an approach for getting a clear estimate of expenses for an FTTH rollout. We focus on the most important expenses and get a balanced and detailed view on the total cost, plus a high level view of the expenses in each of the steps, methods and risks, with a suggested approach on a realistic case study in which we focus on a full, initially GPON based, FTTH deployment in one smaller city (of about 10000 residents) of Belgium.