2010 · 12 citations · 1 references
EngineeringMaterials EngineeringMechanical EngineeringHeat TransferMechanical Behavior Of MaterialsThermal AnalysisDistortion ControlEquipment DesignHeat ControlThermal DesignThermal ManagementThermal Management MaterialsDynamic QuenchingProduction CostsQuenchingStructural Service LifeThermal DistortionThermal Distortion ControlThermal Loss ReductionThermal Stress Mitigation
In many applications the high demands regarding service life of transmission components can be reached only by the application of a customized case hardening. This case hardening process results in a wear resistant surface-layer in combination with a tough core of the component. Howeverasaside-effectthecomponentsgetdistortedduringheattreatment. Thisdistortionhasasignificant cost-impact,becausedistortedcomponentsoftenneedtobehard-machinedafterheattreatment. Therefore the proper control of distortion is an important measure to minimize production costs. Byapplyingthetechnologyoflowpressurecarburizing(LPC)andhighpressuregasquenching(HPGQ)heat treat distortion can be significantly reduced. HPGQ provides a very uniform heat transfer coefficient. The predictability of movement during quenching is more certain and uniform throughout the load. Further improvements can be achieved by “Dynamic Quenching”processeswherethequenchingseverityisvariedduringthequenchsequencebystepcontrolof the gas velocity. Proper fixturing is another factor for distortion control. Modern CFC-materials (carbon reinforced carbon) are well suited as fixture-material for gas quenching. The paper presents how LPC and HPGQ processes are successfully applied on Internal ring gears for a 6 speed automatic transmission. The specific challenge in the heat treat process was to reduce distortion in such a way that subsequent machining operations are entirely eliminated. As a result of extensive development in the quenching process and the use of specialized CFC- fixtures it was possible to meet the design metrological requirements. TheInternalringgearsaddressedinthisreporthavebeenincontinuousproductionsince2006. Subsequent testing and monitoring over a two year period progressively demonstrated that consistent metrology was achieved and quality inspection was reduced accordingly.
1