Activity-based costing application methodology for manufacturing industries

Boris Popesko

Digital Library (University of West Bohemia) · 2010 · 19 citations · 2 references

Full text

Open access

Concepts

Abstract

The subject matter of this paper is the detailed consequences of putting in place an Activity-
\n-Based Costing system and its structure within the manufacturing industry. Moreover, it defines 
\nsteps within ABC application, as well as analyzing the input and output information and data re-
\nquired for effective utilization of the system. The close bond between cost allocation methodology 
\nand application procedures is also determined within this work, thereby describing all the features 
\nnecessary for effective ABC implementation.
\nThe results published herein come from research projects run over a 3-year timeframe, ones 
\nfocused on the methodology of implementing an Activity-Based Costing system and its resultant 
\ninfluence on the efficiency of manufacturing businesses. The author has conducted a number of 
\nABC system applications in manufacturing industries in order to gather the data and information 
\nnecessary to define application and allocation principles.
\nThe paper reveals two final outcomes. The first of these determines the methodology of building 
\nan ABC system, looking at the essential steps necessary to construct a system in an organization. 
\nThe other describes cost allocation methodology, which is performed within separate stages of 
\nimplementation.
\nThe major part of paper is dedicated to explaining the methodological steps within ABC implan-
\ntation, which include a feasibility study and review, activity and cost object definition, assigning 
\ncosts to activities, defining the appropriate cost drivers for individual activities, determining the 
\noutput measures for individual activities, calculating the primary rates of individual activities, assig-
\nning the costs of support activities to primary activities, and calculating the costs of defined cost 
\nobjects.
\nOne important issue that determines the eventual form and structure of the ABC system is 
\nsenior managers’ demand for data utilizable for decision making. All these requirements need to 
\nbe defined in relation to the structure of the system. An effectively implemented Activity-Based 
\nCosting system then provides accurate product costing and proves a useful aid for managing bu-
\nsiness operations. In the final part of paper, the results are discussed according to the all features 
\nof ABC application in the manufacturing industry.

References

2