Research Journal of Applied Sciences Engineering and Technology · 2009 · 16 citations · 2 references
ManagementIndustrial EngineeringOperations ManagementOptimizationPerformance MeasurementSchedulingJob SchedulingMulti-objective SchedulingSchedule OptimizationScheduling OptimizationScheduling TheoryTask SchedulingExpected Time To CompletionMulti-criteria SchedulingOptimization-based SchedulingScheduling ConstraintsScheduling ProblemsTask Scheduling Performance Models
In this Study, we discussed 29 different scheduling criteria. We developed mathematical expressions for all the criteria considered. Each of the criteria was expressed as a function of either the completion time of job or the given parameters. This will assist researchers to easily compute the value of any of the scheduling criteria considered in this study.
2