MPG.PuRe (Max Planck Society) · 1999 · 11 citations · 1 references
EngineeringNuclear EngineeringSystems EngineeringFusion EngineeringNuclear InstrumentationPlasma PhysicsEquipment DesignPlasma DiagnosticsPump InstallationTokamak EngineeringCryogenic System DesignCryogenic SystemsFusion Reactor EngineeringPrimary Pumping SystemsPump System DesignPumping SystemsPumping TestsVacuum Technology
Within the framework of the European Fusion Technology Programme, FZK is involved in the research and development process for a vacuum pump system of a future fusion reactor. As a result of these activities, the concept and the necessary requirements for the primary vacuum system of the ITER fusion reactor were defined. Continuing that development process, FZK has been preparing the test facility TIMO (Test facility for ITER Model pump) since 1996. This test facility provides for testing a cryopump all needed infrastructure as for example a process gas supply including a metering system, a test vessel, the cryogenic supply for the different temperature levels and a gas analysing system. For manufacturing the ITER model pump an order was given to the company L’ Air Liquide in the form of a NET contract. 1. DESCRIPTION OF THE ITER CONCEPT FOR THE PRIMARY VACUUM PUMP SYSTEM The primary vacuum pump system includes in total sixteen identical regenerating cryosorption pumps. Each of these pumps with 1600 mm length and 1500 mm diameter will be installed at the outboard of a divertor pump duct located at the bottom of the plasma chamber of the ITER fusion reactor. The pumping process is based on cryosorption of hydrogen isotopes and helium on 5 K cooled panels with a total pumping area of 8 m2 per pump which are coated with activated charcoal. The impurities of the ITER exhaust gas will be condensed on the 80 K baffles as well as on the 5 K panels [1]. The system of 16 vacuum pumps will provide the required vacuum condition inside the ITER plasma chamber during all foreseen operation phases, as for example plasma operation or pump down. Due to the maximum allowable tritium inventory inside all the vacuum pumps, the pumping system must work in a staggered mode [2]. This means that during the different pumping modes some of the pumps will be regenerated at a temperature of about 80 K or reactivated at a temperature of 300 K depending on the reached pump loading. A normal 1200 s pumping cycle for one pump includes a 900 s sequence for the pumping mode and a 300 s duration for the regeneration mode. During the regeneration several submodes like heating up to 80 K, thermal gas release, pump out and the cooling down of the sorption panels to 5 K must be run. The regenerated gas will be pumped out by a roughing pump station. The foreseen ITER vacuum pumping system must fulfil requirements such as the pumping speed of 1000 m3/s at the operation pressure of 2.5 10 Pa. 2. DESCRIPTION OF THE TIMO TEST FACILITY To demonstrate the feasibility of this pump concept for the ITER reactor, the test facility TIMO has been under construction at FZK since 1996. The intention of this facility is to investigate the pumping performance of a cryosorption pump within all ITER relevant pumping modes, simulating ITER conditions of gas temperature, pressure, gas composition, etc. but not magnetic fields, neutron radiation and tritium exposure. In the following sections the different components of the test facility TIMO will be described. 2.1. Test vessel and the model pump Within the cylindrical test vessel with a diameter of 1800 mm and a length of 4300 mm the test pump will be installed. The test vessel is built in accordance with the PNEUROP standard for vacuum pump testing. For optimisation of the vacuum conditions inside the vessel, the inner surfaces were electropolished. Due to safety reasons caused by the handling of hydrogens, the vessel is constructed to withstand an overpressure of 0.7 MPa. To simulate the divertor duct temperature conditions with a max. temperature of 475 K, the test vessel was equipped with a heating system. For the conditioning of the test vessel with a total volume of 10.4 m3 and for regeneration of the model pump two roughing vacuum stations were installed. The installation of the piping system between the vessel and the metering system for the supply of the process gas and of the exhaust lines including the safety devices was completed. The model pump is a cryopump with a cylindrical housing of 1200 mm in diameter and a length of 1360 mm(see Fig. 1). In the inner system the pump contains a set of laterally arranged cryopanels. These cryopanels are protected against thermal radiation by a 80 K louvre baffle and a 80 K shield system. The total pumping surface of the cryosorption panels installed in the model pump is reduced by a factor of 1:2 compared to the conceptual dimensions of the ITER pump. This yields a total pumping area of 4 m2 for the 16 cryopanels installed in the model pump. Each of the cryopanels (840 x 160 mm2) is manufactured in quilted design and coated on both sides with activated charcoal. For controlling the pressure inside the pump a pneumatically driven valve disk with a diameter of 700 mm and a stroke of 400 mm was installed at the pump inlet port. With this inlet valve the gas throughput during the pumping mode can be controlled by accurate positioning (± 1 mm) of the valve disk, or as a second function the cryopump can be closed during the regeneration and the stand-by mode.
1