Proceedings of the ... ISARC · 2011 · 14 citations · 1 references
EngineeringCivil EngineeringConstruction ManagementBridge EngineeringBuilding Information ModelingConstruction EngineeringArch BridgesBim SimulationBridge ConstructionBridge DesignSteel BridgesStructural DesignBridge ErectionConstructionLiftingLifting OperationsSteel Bridge ConstructionSteel Bridge DesignSteel ErectionSteel Erection Layout
Steel bridge erection requires a series of processes in the construction site including shipping, sequentially lifting, and installing bridge components that are fabricated in the factory. Each process is critical and the risks are high due to the fact that conditions in the field are far more complex than in the factory. A detailed lifting plan is important to ensure the successful completion of steel bridge erection. In this particular study, Building Information Modeling (BIM) tools were used to precisely establish the 3D model of a shape steel arch bridge following 2D detailed design drawings. Combined with the lifting and installation sequences described in the original lifting plan which were prepared by using 2D drawings and explanations, a 4D simulation for the steel bridge erection was produced and used to review and improve the lifting plan.
1