2014 · 14 citations · 10 references
BusinessHydrologyMeteorologyHydrologic ModelingStatistical ModelingStochastic ModelingBayesian InferenceBayesian Model BuildingBayesian ModelingBayesian StatisticsMarkov Chain Monte CarloMaximum Likelihood EstimationExtreme Flood AnalysisExtreme Flood EventsExtreme Value EstimationExtreme Value HydrologyFlood Quantile EstimationHydrologic Extreme Event AnalysisProbabilistic Flood ModelingReturn Period Analysis
Abstract. In this paper we discuss a comparative analysis of the maximum likelihood (ML) and Bayesian parameter estimates of the generalised extreme value (GEV) distribution. We use a Markov Chain Monte Carlo (MCMC) Bayesian method to estimate the parameters of the GEV distribution in order to estimate extreme flood heights and their return periods in the lower Limpopo River basin of Mozambique. The return periods of extreme flood heights based on the Bayesian approach show an improvement over the frequentist approach based on the maximum likelihood estimation (MLE) method. However, both approaches indicate that the 13 m extreme flood height that occurred at Chokwe in the year 2000 due to cyclone Eline and Gloria had a return period in excess of 200 years, which implies that this event has a very small likelihood of being equalled or exceeded at least once in 200 years.
10
Methods for design flood estimation in South Africa
J. Smithers · Water SA · 2012 · 45 citations · Full text
Natural Resources, Civil Engineering, Flood Risk Management +12