Management Science · 1991 · 380 citations · 32 references
ManagementIndustrial EngineeringOperations ManagementOptimizationProduction PlanningSchedulingDynamic ProgrammingLot SizingOptimization In EconomicsResource AllocationScheduling TheoryShortest Path AlgorithmsForward AlgorithmInventory Models With Setup CostsLot Size AnalysisOptimal PoliciesPlanning Horizon AnalysisShortest Path ProblemsSpeculative MotivesWagner-whitin Model
This paper is concerned with the general dynamic lot size model, or (generalized) Wagner-Whitin model. Let n denote the number of periods into which the planning horizon is divided. We describe a simple forward algorithm which solves the general model in 0(n log n) time and 0(n) space, as opposed to the well-known shortest path algorithm advocated over the last 30 years with 0(n 2 ) time. A linear, i.e., 0(n)-time and space algorithm is obtained for two important special cases: (a) models without speculative motives for carrying stock, i.e., where in each interval of time the per unit order cost increases by less than the cost of carrying a unit in stock; (b) models with nondecreasing setup costs. We also derive conditions for the existence of monotone optimal policies and relate these to known (planning horizon and other) results from the literature.
32
Dynamic Version of the Economic Lot Size Model
Harvey M. Wagner, T. M. Whitin · Management Science · 2004 · 2.1K citations
Management, Industrial Engineering, Operations Management +17
Minimizing a Submodular Function on a Lattice
Donald M. Topkis · Operations Research · 1978 · 1.4K citations
Geometric applications of a matrix-searching algorithm
Alok Aggarwal, Maria Klawe, Shlomo Moran et al. · Algorithmica · 1987 · 448 citations