International Journal of Production Research · 2012 · 130 citations · 52 references
ManagementIndustrial EngineeringOperations ManagementProduction ControlProduction PlanningSchedulingFlow Shop SchedulingProduction SchedulingDisruptionsFlow ShopManufacturingProduction CostsProduction Resource PlanningRescheduling
Almost all manufacturing facilities need to use production planning and scheduling systems to increase productivity and to reduce production costs. Real-life production operations are subject to a large number of unexpected disruptions that may invalidate the original schedules. In these cases, rescheduling is essential to minimise the impact on the performance of the system. In this work we consider flow shop layouts that have seldom been studied in the rescheduling literature. We generate and employ three types of disruption that interrupt the original schedules simultaneously. We develop rescheduling algorithms to finally accomplish the twofold objective of establishing a standard framework on the one hand, and proposing rescheduling methods that seek a good trade-off between schedule quality and stability on the other.
52
Scheduling: Theory, Algorithms, and Systems
Michael Pinedo · IIE Transactions · 1996 · 6.3K citations
Benchmarks for basic scheduling problems
Éric D. Taillard · European Journal of Operational Research · 1993 · 2.4K citations
Design and Analysis of Experiments
Technometrics · 2006 · 1.6K citations