American Journal of Agricultural Economics · 1976 · 15 citations · 3 references
ManagementProject ManagementWater Resources ManagementBenefit-cost AnalysisUncertainty QuantificationWater Resources EngineeringCost EstimationProject SelectionProject ValuationPublic Project EvaluationWater Resource EconomicsWater Resource ValuationEconomic UncertaintyMonte Carlo Cost AnalysisNet Present ValueProbabilistic Decision ModelingProject Evaluation Under UncertaintyProject Outcomes MeasurementProject UncertaintyProject Uncertainty Analysis
Abstract The existing benefit‐cost criteria for evaluating water resource projects are deterministic and therefore incomplete, since the uncertainty inherent in project outcomes is not considered. A Monte‐Carlo simulation approach is used to generate a mean and standard deviation for the benefits, costs, benefit‐cost ratio, and net present value for the controversial Spewrell Bluff Project. Subjective estimates defining probability distributions of project benefits and costs were obtained from the Corps of Engineers. A project selection process that includes probability considerations in the benefit‐cost criteria is recommended and several approaches for including uncertainty as a variable are suggested.
3
An Analytical Study of the PERT Assumptions
Kenneth R. MacCrimmon, Charles Ryavec · Operations Research · 1964 · 283 citations
EFFICIENCY IN GOVERNMENT THROUGH SYSTEMS ANALYSIS
Roland N. McKean · 1964 · 151 citations