Multi-batch slip stacking in the main injector at fermilab

Kiyomi Seiya, T. Berenc, Brian Chase, J. Dey, P. W. Joireman, I. Kourbanis, J. Reid

2007 · 18 citations · 0 references

DOIFull text

Open access

Concepts

Abstract

The Main Injector (MI) at Fermilab is planning to use multi-batch slip stacking scheme in order to increase the proton intensity at the NuMI target by about a factor of 1.5.[1] [2] By using multi-batch slip stacking, a total of 11 Booster batches are merged into 6, 5 double ones and one single. We have successfully demonstrated the multi- batch slip stacking in MI and accelerated a record intensity of 4.6E13 particle per cycle to 120 GeV. The technical issues and beam loss mechanisms for multi- batch slip stacking scheme are discussed.