Partial Discharge Measurement on Three phase Construction

Umar Khayam, Shinya Ohtsuka, Satoshi Matsumoto, Masayuki Hikita

2006 · 13 citations · 2 references

Concepts

Abstract

This paper deals with partial discharge measurement on three phase construction. It was shown that the measurement must be conducted on all phases simultaneously to obtain measurement result of partial discharge occurring in whole region of three phase construction with high sensitivity and to obtain information of the partial discharge location. Partial discharge from artificial defect was measured. Experimental results showed some special characteristics of partial discharge in three phase construction. These results were discussed with considering electric field characteristic in three phase construction and coupling capacitance between three phase conductors and between the conductors and the tank.

References

2