Publication | Closed Access
Multiprocessor EDF and deadline monotonic schedulability analysis
268
Citations
15
References
2004
Year
Unknown Venue
EngineeringComputer ArchitectureMultiprocessor EdfDeadline-monotonic SchedulingSystems EngineeringParallel ComputingSporadic Real-time TasksComputer EngineeringScheduling (Computing)Computer ScienceReal-time AlgorithmReal-time ComputingScheduling AnalysisSchedulability TestsScheduling ProblemReal-time Multiprocessor SystemReal-time SystemsParallel ProgrammingScheduling (Project Management)
Schedulability tests are presented for preemptive earlier-deadline-first and deadline-monotonic scheduling of periodic or sporadic real-time tasks on a single-queue m-server system, in which the deadline of a task may be less than or equal to the task period. These results subsume and generalize several known utilization-based multiprocessor schedulability tests, and are derived via an independent proof.
| Year | Citations | |
|---|---|---|
Page 1
Page 1