2004 · 10 citations · 0 references
EngineeringPetroleum EngineeringDrillingDrilling EngineeringGeotechnical EngineeringDrill Bit TechnologyDrilling OperationsDrilling OptimizationHorizontal DrillingRotary DrillingWell PlanningDrill Bit PerformanceDrill Parameter OptimizationDrilling EfficiencyDrilling Parameter OptimizationDrilling Performance OptimizationHole Section DesignMud Program OptimizationRotary Steerable Systems
Abstract In the Alpine Development Field of western North Slope, Alaska, application of new technology throughout the continuous drilling of more than 70 horizontal wells has produced an impressive step change in drilling efficiency. This step change is demonstrated clearly by real time cost savings and a significant reduction in drilling times even as the wells have become more challenging both in length and complexity. Analysis of the extensive Alpine Development Field database of over 1,000,000 feet of hole drilled to date reveals how introduction of new technology and optimized operating parameters in the past two years has increased drilling efficiency by 17%. Noting economic and environmental issues driving the need for increased efficiencies, the paper addresses the factors that most directly contributed to achieving that goal. These include: comprehensive well planning; optimization of rig capabilities, mud program and operating parameters; and "point-the-bit" rotary steerable technology matched with advanced technology PDC bits. Highlighted are specific performance achievements in the 8 ½" hole section, a key driver for increasing efficiencies. This interval, which can exceed 10,000 feet, is drilled using the rotary steerable system, allowing utilization of 4" drill-pipe in both 8 ½" and 6-1/8" hole sections for significant time savings through management of both ECDs and standpipe pressure. Planning/performance of rotary steerable runs, record ROPs achieved, and new bit design technology are detailed, and application and limitations of the new technology are clearly defined through a description of "lessons learned" in achieving this step change in performance. Finally, economic analysis shows the significant savings realized to date, and estimates savings over the course of the remaining 20 planned wells to exceed four million dollars.