IEEE/ACM Transactions on Networking · 1993 · 630 citations · 10 references
ComputingCommunicationComputer ScienceAlgorithmsComputer NetworksDigital CommunicationCommunication NetworksNetwork Flow AlgorithmsNetwork OptimizationRoutingRouting AlgorithmsRouting ProtocolsEnd-to-end DelayEnd-to-end Delay AnalysisEnd-to-end Delay OptimizationHeuristicsMulticast CommunicationMulticast RoutingMulticast TopologyMulticasting
The authors present heuristics for multicast tree construction for communication that depends on: bounded end-to-end delay along the paths from source to each destination and minimum cost of the multicast tree, where edge cost and edge delay can be independent metrics. The problem of computing such a constrained multicast tree is NP-complete. It is shown that the heuristics demonstrate good average case behavior in terms of cost, as determined by simulations on a large number of graphs.< <ETX xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">></ETX>
10
A note on two problems in connexion with graphs
E. Dijkstra · Numerische Mathematik · 1959 · 23.8K citations
Robert W. Floyd · Communications of the ACM · 1962 · 4K citations · Full text
Routing of multipoint connections
Bernard M. Waxman · IEEE Journal on Selected Areas in Communications · 1988 · 2.9K citations
A fast algorithm for Steiner trees
Lawrence T. Kou, George Markowsky, L. Berman · Acta Informatica · 1981 · 1.2K citations
An approximate solution for the Steiner problem in graphs
Haruhisa Takahashi, A Matsuyama · Mathematica japonica · 1980 · 884 citations