Publication | Closed Access
Robust closed-loop supply chain network design for perishable goods in agile manufacturing under uncertainty
198
Citations
48
References
2011
Year
Interval Data UncertaintySupply Chain OptimizationEngineeringIndustrial EngineeringSupply NetworkClosed-loop Supply ChainSupply Chain ResilienceOperations ResearchInventory ManagementGeneral Comprehensive ModelSupply Chain DisruptionSystems EngineeringSupply ChainLogisticsSupply Chain ViabilityPerishable GoodsDesignComputer EngineeringManufacturing PlanningSupply Chain DesignSupply Chain ManagementProduction PlanningProduction SchedulingBusinessLingo 8
In this study, a general comprehensive model is proposed for strategic closed-loop supply chain network design under interval data uncertainty. The proposed model considers various assumptions such as multiple periods, multiple products, and multiple supply chain echelons as well as uncertain demand and purchasing cost. In addition, bill of materials for each product is considered via a new approach in management of forward and reverse flows of products for producing new products and reusing or disassembling returned products. Uncertainty of parameters in the proposed model is handled via an interval robust optimisation technique. The model assumptions are well matched with decision making environments of food and high-tech electronics manufacturing industries. The factors that make these two industries similar are time-dependent properties of products such as prices and warehousing lifetime period. The computational results of solving the proposed model via LINGO 8 demonstrate efficiency of the proposed model in dealing with uncertainty in an agile manufacturing context.
| Year | Citations | |
|---|---|---|
Page 1
Page 1