Operations Research · 1975 · 43 citations · 3 references
ManagementIndustrial EngineeringOperations ManagementProduction PlanningProduction SystemsSchedulingJob SequencingMachine SchedulingProduction Planning SystemsProduction SchedulingScheduling OptimizationSequencingDue Date ControlDue DatesDue-date DeterminationFeasibility CheckingScheduling With Due DatesSetup CostSetup Cost Modeling
This paper presents an algorithm for determining an optimum solution to a two-stage production sequencing problem with these characteristics: There are n jobs to be sequenced in a two-stage production environment; each production stage is equipped with a single facility; jobs to be sequenced are subject to due-date constraints; facilities in both stages require setup prior to processing each job; setup times in both stages are sequence dependent, and setup cost is assumed to be directly proportional to setup time; and the optimal solution is one that minimizes the total setup cost (of stages I and II) without violating job-due dates. The algorithm employs controlled enumeration through branch-and-bound procedures, together with feasibility tests.
3
Branch-and-Bound Methods: A Survey
Eugene L. Lawler, Derek Wood · Operations Research · 1966 · 2K citations
The Traveling-Salesman Problem
Merrill M. Flood · Operations Research · 1956 · 670 citations