2007 · 203 citations · 22 references
ComputingChange ManagementQuality EngineeringRisk AssessmentSoftware EngineeringEarly WarningSoftware MaintenanceAutomated Bug FindingBug TrackingFalse Positive Rate AnalysisPrioritizationSoftware Change ControlSoftware Change Management
Automatic bug-finding tools have a high false positive rate: most warnings do not indicate real bugs. Usually bug-finding tools assign important warnings high priority. However, the prioritization of tools tends to be ineffective. We observed the warnings output by three bug-finding tools, FindBugs, JLint, and PMD, for three subject programs, Columba, Lucene, and Scarab. Only 6%, 9%, and 9% of warnings are removed by bug fix changes during 1 to 4 years of the software development. About 90% of warnings remain in the program or are removed during non-fix changes - likely false positive warnings. The tools' warning prioritization is little help in focusing on important warnings: the maximum possible precision by selecting high-priority warning instances is only 3%, 12%, and 8% respectively. In this paper, we propose a history-based warning prioritization algorithm by mining warning fix experience that is recorded in the software change history. The underlying intuition is that if warnings from a category are eliminated by fix-changes, the warnings are important. Our prioritization algorithm improves warning precision to 17%, 25%, and 67% respectively.
22
Extended static checking for Java
Cormac Flanagan, K. Rustan M. Leino, Mark Lillibridge et al. · 2002 · 1.3K citations
Jacek Śliwerski, Thomas Zimmermann, Andreas Zeller · ACM SIGSOFT Software Engineering Notes · 2005 · 803 citations
David Hovemeyer, William Pugh · 2004 · 775 citations
Predicting fault incidence using software change history
Todd Graves, Alan F. Karr, J. S. Marron et al. · IEEE Transactions on Software Engineering · 2000 · 751 citations