Publication | Closed Access
Optimization Study on Voltage Level and Transmission Capacity
19
Citations
4
References
2009
Year
Jinsha Power StationsElectrical EngineeringEngineeringSmart GridEnergy ManagementJinsha RiverElectrical TransmissionCivil EngineeringHydropowerElectric Power TransmissionOptimization StudyPower ElectronicsElectric Power DistributionPower Station
Jinsha river has very abundant hydro power reservation, ranking first in all the hydro power bases of China. To deliver the 38-GW hydro power from Jinsha power stations by HVDC transmission lines to load centers 1000-2000 km away, it is necessary to determine the right voltage level and the capacity of each bipole. This paper proposes three preliminary power delivery scheme and presents an optimization method for transmission capacity, dc voltage and conductor size. Based on a comprehensive comparison of cost-effectiveness, technical feasibility and network security and stability, it was recommended that the 3 bipolar plusmn 800-kV ultra HVDC (UHVDC) links with rated capacity of 6.4 GW for each link be adopted as transmission scheme of phase I hydro power station on Jinsha River.
| Year | Citations | |
|---|---|---|
Page 1
Page 1