IEEE Transactions on Power Delivery · 2009 · 21 citations · 8 references
EngineeringElectrical EngineeringInfrastructure PlanningEnergy EconomicsEnergy SystemsRenewable Energy SystemsInfrastructure EfficiencyPower Grid AnalysisThree-phase CircuitsTransmission LinesTransmission PlanningTransmission SystemsElectric Transmission PlanningLand OccupationThree-phase Distribution NetworksThree-phase PowerTransmission Expansion PolicyTransmission Grid ExpansionTransmission Line Power FlowTransmission System Expansion
This paper investigates the economical feasibility of four-phase (4P) overhead transmission lines, considered as a possible alternative to the traditional three-phase (3P) connections. The paper performs an economical comparison between innovative 4P transmission lines and traditional 3P lines, with the goal of evaluating the contests where a 4P connection could become convenient, accounting for different reliability, land occupation, visual impact, energy losses and investment costs.
8
Using surveys to value public goods: the contingent valuation method
Choice Reviews Online · 1989 · 4.3K citations · Full text