IEEE Computer Applications in Power · 1996 · 30 citations · 1 references
EngineeringElectrical EngineeringSystems EngineeringEnergy EconomicsEnergy PolicyEnergy SystemsDistributed Energy ResourcesPower SystemsSystems IntegrationTransmission PlanningElectric Power Grid PlanningElectric Power NetworksElectric Power RegulationElectric Transmission PlanningInefficient Resource UseInterconnected Power SystemsMarket Imperfections TheoryPower System Planning
A restructuring of the electric power business in the United States is under way. The form of the restructuring will shift the industry focus from local, vertically integrated monopolies to regional, competitive, and unbundled corporate structures. The premise for change is that market imperfections occur under the regulated monopolistic structure, leading to inefficient use of the interconnected transmission and generation systems. The new order, generically called POOLCO, will not require any fundamentally new analytical system planning methods. It will, however, require the merging of existing generation and transmission (G&T) software into a new G&T system planning function. POOLCO will also require development of new accounting software and communications media.
1