International Journal of Mining and Mineral Engineering · 2014 · 34 citations · 15 references
EngineeringMining EngineeringOperations ManagementProduction EngineeringProduction PlanningProduction SystemsEquipment PlacementEquipment SelectionEquipment SizingHaulage System DesignProductivity AnalysisUnderground Mine EquipmentDiscrete Event Simulation ModelsDiscrete-event System SimulationHaulageHaulage Equipment SelectionHaulage SystemsMine Haulage PlanningMine Haulage System DesignMine Production Optimization
The selection of equipment for haulage in underground mines is a challenge due to its impact on both production rates and costs. The selected equipment should create an optimal match for the complete system and the point when equipment is to be added or replaced needs to be identified before the change is made. The use of discrete event simulation to compare two different haulage units of different size with the aim of improving production is presented. The feasibility of the production targets was also analysed. The result shows that, the smaller unit improves the average production from 52% to 75% while the bigger unit improves to 83% of the planned production target. This shows that the production will rise by 8% when smaller units are replaced by bigger units. This may need to be justified financially as the costs associated with changing the truck size might be recuperated by extra production gained. Furthermore, the study showed that current production targets were not feasible under the given circumstances.
15
Discrete-Event System Simulation
Jerry Banks, John S. Carson · Technometrics · 1984 · 2.7K citations
Verification and validation of simulation models
Robert G. Sargent · Journal of Simulation · 2012 · 1.7K citations
Discrete-Event System Simulation
Carolyn Morgan · Technometrics · 1984 · 1.4K citations
Verification and validation of simulation models
Robert G. Sargent · 2004 · 455 citations
Jerry Banks · 1999 · 307 citations