30 GHz Power Production in CTF3

C. Achard, H. Braun, G. Carron, R. Corsini, A. Grudiev, Samuli Heikkinen, Daniel Schulte, Jonathan P H Sladen, Igor Syratchev, F. Tecker,

Proceedings of the 2005 Particle Accelerator Conference · 2006 · 20 citations · 1 references

Concepts

Abstract

One of the major objectives of CTF3 (CLIC Test Facility) is the production of 30 GHz power for the high-gradient testing of CLIC accelerating structures. To this end a dedicated beam line, power generating structure and power transfer line have been designed, installed and commissioned. 52 MW of 30 GHz power with a pulse length of 74 ns and a repetition rate of 16 Hz were delivered to the high-gradient test area. This will allow operation of test accelerating structures in the first CTF3 run of 2005 up to the nominal CLIC accelerating gradient of 150 MV/m and beyond the nominal pulse length. The system is described and the performances of the CTF3 linac, beam line and the rf components are reviewed.

References

1