International Journal of Production Research · 2009 · 21 citations · 16 references
EngineeringIndustrial EngineeringManufacturing EngineeringParallel AlgorithmsProduction EngineeringSchedulingHeuristic OptimizationJob SchedulingJob SequencingMachine SchedulingProduction SchedulingScheduling TheoryExpected Completion Time MinimizationHigh-voltage SystemsParallel Job SchedulingParallel Machine SchedulingParallel Scheduling AlgorithmsSetup TimesUnrelated Parallel Machine Scheduling
This paper considers a scheduling problem in the manufacturing of anodic electro-etching aluminium foil. To reduce cost and increase efficiency, the manufacturer of aluminium foil usually designs the equipment for electro-etching of aluminium foil into specialised equipment that is dedicated to produce high voltage or medium voltage aluminium foil based on the range the aluminium foil can bear. Nevertheless, high voltage equipment can be used to produce medium voltage aluminium foil with longer processing time, and vice versa. The problem is to schedule jobs on the high and medium voltage equipment, each having several pieces in parallel, with setup times to minimise to the total completion time. In this paper, we propose a three-stage heuristic for this problem and computationally evaluate the performance of the heuristic in comparison to a heuristic for unrelated parallel machines and a branch-and-bound algorithm.
16
Scheduling: Theory, Algorithms, and Systems
Michael Pinedo · IIE Transactions · 1996 · 6.3K citations
A survey of scheduling problems with setup times or costs
Ali Allahverdi, C.T. Ng, T.C.E. Cheng et al. · European Journal of Operational Research · 2006 · 1.3K citations · Full text
Management, Industrial Engineering, Operations Management +12