BuR - Business Research · 2011 · 15 citations · 14 references
ManagementIndustrial EngineeringOperations ManagementInventory ManagementOptimizationProduction PlanningCombinatorial OptimizationInteger ProgrammingInventory OptimizationLinear ProgrammingProcess OptimizationProduction OptimizationBuffer AllocationBuffer OptimizationConwip SystemsInventory Level OptimizationOptimal Inventory LevelsOptimization Under Inventory ConstraintsProduction Flow OptimizationProduction Line Optimization
Abstract This paper treats the problem of setting the inventory level and optimizing the buffer allocation of closed-loop flow lines operating under the constant-work-in-process (CONWIP) protocol. We solve a very large but simple linear program that models an entire simulation run of a closed-loop flow line in discrete time to determine a production rate estimate of the system. This approach introduced in Helber, Schimmelpfeng, Stolletz, and Lagershausen (2011) for open flow lines with limited buffer capacities is extended to closed-loop CONWIP flow lines. Via this method, both the CONWIP level and the buffer allocation can be optimized simultaneously. The first part of a numerical study deals with the accuracy of the method. In the second part, we focus on the relationship between the CONWIP inventory level and the short-term profit. The accuracy of the method turns out to be best for such configurations that maximize production rate and/or short-term profit.
14
Proceedings of the 2000 winter simulation conference
Jeffrey A. Joines, Russell R. Barton · 2000 · 413 citations