International Journal of Production Research · 1989 · 13 citations · 2 references
ManagementIndustrial EngineeringManufacturing EngineeringProduction PlanningReal-time SystemsSchedulingFlexible Manufacturing SchedulingMachine SchedulingProduction SchedulingReal-time SchedulingReal-time Systems DesignSchedulability AnalysisAlgorithm Performance EvaluationAssembly SchedulingDue DatesFlexible Production SystemsReal-time DispatchingRelease DatesScheduling AlgorithmsScheduling With Release Dates
SUMMARY An algorithm for the near real-time dispatching and routing of multiple products in a Flexible Assembly System (FAS) environment, called schedule, was described in an earlier paper. This paper presents extended test conditions and results associated with the use of schedule over the test conditions. The extended testing includes results on algorithm performance for larger and more complex assemblies, larger workloads, parametrization on the urgency factor setting in schedule randomization of job due-dates, and a distribution of the job release dates for the workloads assigned to the FAS.
2
Assembly Line Balancing with Multiple Stations
Geoff Buxey · Management Science · 1974 · 121 citations
Management, Industrial Engineering, Operations Management +13