Publication | Closed Access
A spatial scheduling application at the block paint shop in shipbuilding: the HYPOS project
30
Citations
7
References
2002
Year
Facility PlanningBlock Paint ShopEngineeringComputer-aided DesignSocial SciencesOperations ResearchSpatial DesignHypos ProjectBlock Assembly ShopsSystems EngineeringLogisticsCombinatorial OptimizationSpatial Scheduling ProblemsComputational GeometrySpatial SchedulingDesignInteger ProgrammingScheduling AnalysisArchitectural DesignIndustrial DesignSpatial Scheduling ApplicationScheduling ProblemProduction SchedulingScheduling (Production Processes)Construction Management
Abstract A spatial scheduling pursues the optimal dynamic spatial layout schedule that also satisfies traditional scheduling constraints. In a shipyard, spatial scheduling problems occur in various working areas, such as block assembly shops, grand block assembly shops, dry docks, and block paint shops. In the literature, a few studies applied the spatial scheduling on the shipbuilding process, but only on the block assembly shop. Keywords: ShipbuildingBlock Paint Shop
| Year | Citations | |
|---|---|---|
Page 1
Page 1