Water Science & Technology · 1999 · 13 citations · 7 references
EngineeringChemical EngineeringEnvironmental EngineeringProcess ControlProcess Systems EngineeringWastewater TreatmentActivated Sludge ProcessBiological Treatment ProcessesNitrogen RemovalNutrient RemovalSludge TreatmentWastewater ManagementAerationEffluent Quality ControlOptimal Control TuningProcess Control Of Nitrogen RemovalProcess Modeling Of Nitrogen RemovalTuningWastewater Effluent QualityWastewater Sludge Management
Four control strategies for N-removal in alternating activated sludge plants (ASP's) are compared: 1. timer-based, 2. switching the aeration on/off when depletion of nitrate/ammonium is detected, 3. switching the aeration on/off when ammonium crosses an upper/lower-bound, 4. the newly developed adaptive receding horizon optimal controller (ARHOC) as presented in Lukasse et al. (1997). The comparison is made by simulating the controllers' application to an alternating continuously-mixed activated sludge reactor preceded by a small anoxic reactor for predenitrification. The biological processes in the reactors are modelled by the activated sludge model no. 1. Realistic influent patterns, measured at a full-scale wastewater treatment plant, are used. The results show that three totally different controllers (timer-based, NH4-bounds based and ARHOC) can achieve a more or less equal effluent quality, if tuned optimally. The difference mainly occurs in the sensitivity to suboptimal tunings. The timer-based strategy has a higher aeration demand. The sensitivity of the ARHOC controller to sub-optimal tuning, known measurement time delays and changing plant loads is significantly less than that of the other controllers. Also its tuning is more natural and explicit.
7
Willi Gujer, Mogens Henze, Takahashi Mino et al. · Water Science & Technology · 1999 · 1.8K citations
Engineering, Chemical Engineering, Environmental Engineering +14