Management Science · 1986 · 81 citations · 10 references
ManagementIndustrial EngineeringOperations ManagementCost ManagementProduction PlanningStochastic ModelingAssembly Line BalancingJob SequencingLine BalancingStochastic ProgrammingStochastic SchedulingBalancingCost Estimation MethodologyCost Function ModelingCost Savings AnalysisCost Savings EvaluationStochastic Assembly Line BalancingStochastic Cost ModelingStochastic Line Balancing
This paper examines the effect of stochastic task times on the total operating costs of a continuously paced assembly line under the assumption that the line is stopped whenever at least one work station requires more time than allotted. A comprehensive stochastic cost function is integrated into an efficient balancing algorithm to enable an approximately minimum cost balance to be obtained. An experiment was conducted to determine the cost savings resulting from using the stochastic method as compared to two deterministic methods. The stochastic method of this paper produced lower cost balances in most cases studied.
10
Summary of a Heuristic Line Balancing Procedure
Fred M. Tonge · Management Science · 1960 · 102 citations
Engineering, Industrial Engineering, Operations Management +10