Pet. Eng.; (United States) · 1975 · 13 citations · 0 references
EngineeringPetroleum EngineeringDrillingDrilling EngineeringReservoir EngineeringWell CompletionWell Completion DesignWell Performance AnalysisWellbore StabilityFormation Damage PreventionPorous FlowProductivityReservoir Damage MitigationWell Productivity Analysis
The extent to which mud solids invade a porous formation depends on the amount of mud spurt, and that depends mainly on the amount of primary bridging particles in the mud. With most muds and formations, bridging is rapid and the mud spurt penetrates only 1 to 2 in. into the formation. When the well is brought into production, most of the contamination will be carried back into the well. However, enough will remain to impair productivity a little, about 10% at the most. If the well is gun-perforated, the tunnels will extend well beyond the invaded zone, and impairment by solids will be negligible. Many formations can be completed with the drilling fluid used to drill the upper part of the hole without significant impairment. Problem wells and reservoirs especially liable to solids impairment require special treatment. If reservoir conditions permit, the surest way to avoid impairment is to use gas, foam or an underbalanced mud column. When this is not possible, it is best to use one of the special completion and workover fluids now on the market.