The Fermi National Accelerator Laboratory

J. R. Sanford

Annual Review of Nuclear Science · 1976 · 39 citations · 0 references

DOIFull text

Open access

Concepts

Abstract

We describe an upgrade for CDF’s L2 decision crate for Run IIb. The system is based on the Pulsar board currently under construction for the L2 test stand. The goal of the system is to have a high data bandwidth and, at the same time, to be highly mod-ular, maintainable and flexible, and to use off-the-shelf hardware whenever possible. The modularity is achieved by building a universal interface board that can be inter-connected in a variety of ways. Maintainability is achieved with this interface card as the only custom component in the system. Off-the-shelf components include the CERN S-Link interface cards and commodity processors. This approach is designed with three goals. Foremost, the design must have sufficient safety margin and flexi-bility in performance to meet the challenges of the high-occupancy Run IIb triggering environment. Second, ease of maintenance by using a small amount of custom hard-ware with built-in self-test capabilities. Finally, the design has a simple upgrade path with externally supported links and commercial processors. This note was previously released as a chapter of the Run IIb TDR[1].