Operations Research · 1988 · 128 citations · 3 references
EngineeringIndustrial EngineeringManufacturing EngineeringManufacturing SystemsOptimizationSchedulingCombinatorial OptimizationFlexible Manufacturing SchedulingFlexible Manufacturing SystemsJob SequencingMachine SchedulingProduction SchedulingFlexible ManufacturingManufacturing
This paper deals with a job scheduling problem for a flexible manufacturing machine. We consider the same manufacturing environment described in a companion study (Part I), but we use a different performance criterion: to minimize the total number of instants at which tools are switched. This performance criterion is appropriate when the switching time is roughly constant and independent of the number of tool switches. We show that this scheduling problem generalizes the classical bin packing problem, and we present a non-LP-based branch-and-bound procedure that terminates with an optimal solution. We extend this procedure to the case of K machines in sequence.
3
Worst-Case Performance Bounds for Simple One-Dimensional Packing Algorithms
D. S. Johnson, Alan Demers, Jeffrey D. Ullman et al. · SIAM Journal on Computing · 1974 · 913 citations
`` Strong '' NP-Completeness Results
M. R. Garey, David Johnson · Journal of the ACM · 1978 · 657 citations · Full text