ODU Digital Commons (Old Dominion University) · 2006 · 19 citations · 20 references
Open access
ManagementComputer ScienceIndustrial EngineeringMarkov Decision ProcessesParallel ComputingSchedulingBatch SchedulingJob SchedulingJob SequencingMachine SchedulingStochastic SchedulingTask SchedulingHeuristicsNp-hardnessParallel Machine SchedulingScheduling With Sequence-dependent Setup TimesSequence-dependent Setup TimesSetup TimesUnrelated Parallel Machine Batch SchedulingUnrelated Parallel Machine Scheduling
AbstractThis paper addresses the problem of batch scheduling in an unrelated parallel machine environment with sequence dependent setup times and an objective of minimizing the total weighted mean completion time. The jobs’ processing times and setup times are stochastic for better depiction of the real world. This is a NP-hard problem and in this paper, new heuristics are developed and compared to existing ones using simulation. The results and analysis obtained from the computational experiments proved the superiority of the proposed algorithm PMWP over the other algorithms presented.
20
Taguchi Techniques for Quality Engineering
Thomas R. Bement · Technometrics · 1989 · 2.7K citations
A survey of scheduling problems with setup times or costs
Ali Allahverdi, C.T. Ng, T.C.E. Cheng et al. · European Journal of Operational Research · 2006 · 1.3K citations · Full text
Management, Industrial Engineering, Operations Management +12