Proceedings of the 1997 Particle Accelerator Conference (Cat. No.97CH36167) · 2002 · 11 citations · 1 references
Natural SciencesNuclear EngineeringPhysicsNuclear InstrumentationParticle PhysicsRadiation PhysicsAccelerator PhysicsElectron Beam PhysicsX-ray OpticsX-ray ProductionBeam OpticsElectron AcceleratorsSoft LightSoft X-ray Optics
The main facility of the New SUBARU project is the 1.5 GeV electron storage ring which is under construction at the SPring-8 site in Harima Science Garden City. The first beam commissioning from the Spring-8 LINAC is scheduled at the end of March, 1998. The aim of new SUBARU is to promote industrial activities in the local area (Hyogo prefecture) and to develop experimental investigations for new light sources.
1
Characteristics of a SiC microwave absorber for a damped cavity
M. Izawa, T. Koseki, Y. Kamiya et al. · Review of Scientific Instruments · 1995 · 23 citations