Journal of Hydrology Regional Studies · 2015 · 38 citations · 5 references
Natural ResourcesInfrastructure PlanningWater Resources ManagementWater PolicyWater Resources EngineeringWater Resources PlanningHydropower EngineeringHydropower SystemsRenewable EnergyRiver EngineeringWater ManagementWater Resource PolicyCo-creation With StakeholdersGreenhouse Gas EmissionsGreenhouse Gas Emissions AssessmentHydropower InstallationsMicro HydropowerPower GenerationWater InfrastructuresWater Resource Conflicts
Beppu City, Oita Prefecture, Japan was selected for the study, but the analysis is limited by existing infrastructure, regulatory restrictions on river use, and potential ecological impacts of new MHP installations. The study seeks quantitative guidelines to reduce water‑energy conflicts in mini/micro hydropower development, emphasizing the need for regulatory reform and incentives to support local economic benefits. The authors estimated MHP power potential for six Beppu rivers using three distinct river‑level and discharge calculation methods. The analysis indicates that MHP installations can supply stable power to tens or hundreds of residents, with higher potential if additional infrastructure is developed.
Beppu City, Oita Prefecture, Japan was selected as a site of this study. This study aims to provide quantitative guidelines necessary for capacity building among various stakeholders to minimize water-energy conflicts in developing mini/micro hydropower (MHP), a baseload renewable energy that is socially necessary, not only to reduce greenhouse gas emissions but also to vitalize local economies by creating jobs related to MHP operations. Using three different methods to calculate river water levels and discharges, the potential power generation by MHP was estimated for six rivers in Beppu City. Our results show that installation of MHP facilities can provide stable electricity for tens to hundreds of residents in local communities along the rivers. However, the results are based on the existing infrastructure, such as roads and electric lines. This means that greater potential is expected if additional infrastructures are built to develop further MHP facilities. On the other hand, in Japan, river laws and irrigation right regulations currently restrict new entry by actors to rivers. Therefore, to further develop MHP, deregulation of the existing laws relevant to rivers and further incentives for business owners of MHP facilities, along with the current feed-in tariffs, are required. Meanwhile, possible influences to riverine ecosystems when installing new MHP facilities should also be taken into account.
5
Gis-based procedures for hydropower potential spotting
Dante G. Larentis, Walter Collischonn, Francisco Olivera et al. · Energy · 2010 · 119 citations · Full text
Natural Resources, Geoinformatics, Water Resources Management +13