Journal of Construction Engineering and Management · 2002 · 159 citations · 14 references
ManagementConstruction ManagementProject ManagementConstruction Project ManagementConstruction SchedulingSchedulingConstruction PlanningCritical Path AnalysisSpace Requirements AnalysisSpace Utilization AnalysisConstruction Schedule OptimizationCritical Path SchedulingDecision Support System IntegrationProductivity Loss AnalysisProductivity Loss EstimationSpatial Conflict AnalysisSpatial SchedulingTemporary Facilities Planning
Construction sites host workers, equipment, materials, temporary and permanent structures that compete for limited space, which can hinder productivity and delay the critical path. The study aims to evaluate how time‑based space availability, productivity loss, and path interference can be mitigated by identifying alternative spaces to optimize site usage. A decision‑support prototype was built by integrating computer‑aided design with scheduling software to dynamically detect conflicts and applying supplemental criteria for analysis and resolution. A case study shows the prototype effectively resolves space conflicts, proving useful for engineers and project managers.
Numerous workers, equipment, material, temporary facilities, as well as permanent structures share the limited space during construction. Since space constraints may affect productivity and the critical path, it is essential to organize the available space efficiently and minimize space conflicts. This study considers space availability due to time and scheduling, productivity loss due to space constraints and path interference, as well as the possibility of alternative space to resolve these conflicts and optimize space usage. Herein, computer-aided design is integrated with scheduling software for the dynamic identification of space conflicts on the jobsite. Follow-up supplemental decision criteria are then provided for conflict analysis and resolution. A prototype decision support system that combines the criteria was developed to solve this significant and complex problem more efficiently and precisely. A case study demonstrates the use and development of this system, which is very helpful to engineers and project managers.
14