OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information) · 2010 · 23 citations · 18 references
Open access
Natural SciencesComputational EngineeringOptimizationRenewable Energy IntegrationRenewable Energy SystemsApproximation AlgorithmsCombinatorial OptimizationEnergy System ModelingTransmission PlanningExpansion PlanningGeneration Expansion PlanningNetwork Expansion PlanningNonconvex OptimizationPower System PlanningTransmission Grid ExpansionTransmission Network Expansion PlanningTransmission System Expansion
In recent years the expansion planning prob-lem has become increasingly complex. As expan-sion planning (sometimes called composite or inte-grated resource planning) is a non-linear and non-convex optimization problem, researchers have traditionally focused on approximate models of power flows to solve the problem. The prob-lem has also been split into generation expansion planning (GEP) and transmission network expan-sion planning (TNEP) to improve computational tractability. Until recently these approximations have produced results that are straight-forward to combine and adapt to the more complex and com-plete problem. However, the power grid is evolv-ing towards a state where the adaptations are no longer easy (e.g. large amounts of limited con-trol, renewable generation, comparable generation and transmission construction costs) and necessi-tates new approaches. Recent work on determin-istic Discrepancy Bounded Local Search (DBLS) has shown it to be quite effective in addressing the TNEP. In this paper, we propose a generalization of DBLS to handle simultaneous generation and transmission planning.
18
C. Grigg, P. Wong, P. F. Albrecht et al. · IEEE Transactions on Power Systems · 1999 · 3.1K citations
Engineering, Electrical Engineering, Systems Engineering +15
Optimization for Simulation: Theory vs. Practice
Michael C. Fu · 2002 · 540 citations
William D. Harvey, Matthew L. Ginsberg · 1995 · 515 citations