Publication | Closed Access
Fast $\lambda$-Iteration Method for Economic Dispatch With Prohibited Operating Zones
115
Citations
4
References
2014
Year
EngineeringContinuous OptimizationSmart GridEnergy ManagementPower Grid OperationOptimization ProblemComputer EngineeringPower System OptimizationSystems EngineeringFast λ-IterationEconomic DispatchElectric Power DistributionEd ProblemPower SystemsDynamic OptimizationOperations Research
This letter presents a new method, the fast λ-iteration (FλI) method, to solve the economic dispatch (ED) problem considering the prohibited operating zones (POZs) and ramp rate limits of generation units. Necessary conditions for the optimal solution of the ED problem are presented and proved. The efficiency of the method has been verified on a 15-unit system and a Korea 140-unit system.
| Year | Citations | |
|---|---|---|
Page 1
Page 1