Operations Research · 1989 · 257 citations · 27 references
Natural SciencesIndustrial EngineeringOperations ManagementFacility LocationOptimizationSchedulingCombinatorial OptimizationDiscrete OptimizationHeuristic OptimizationInteger ProgrammingNetwork OptimizationTransportation ProblemsCapacitated Network DesignFixed-charge Location ProblemFreight Transport ModelsNetwork Design ProblemsShortest Path OptimizationSteiner SystemsSteiner Tree Problem
The fixed-charge network design problem arises in a variety of problem contexts including transportation, communication, and production scheduling. We develop a family of dual-ascent algorithms for this problem. This approach generalizes known ascent procedures for solving shortest path, plant location, Steiner network and directed spanning tree problems. Our computational results for several classes of test problems with up to 500 integer and 1.98 million continuous variables and constraints show that the dual-ascent procedure and an associated drop-add heuristic generate solutions that, in almost all cases, are guaranteed to be within 1 to 4% of optimality. Moreover, the procedure requires no more than 150 seconds on an IBM 3083 computer. The test problems correspond to dense and sparse networks, including some models that arise in freight transport.
27
A note on two problems in connexion with graphs
E. Dijkstra · Numerische Mathematik · 1959 · 23.8K citations