Assessing mechanical loading regimes and fatigue life of marine power cables in marine energy applications

Philipp R. Thies, Lars Johanning, George Smith

Proceedings of the Institution of Mechanical Engineers Part O Journal of Risk and Reliability · 2011 · 61 citations · 13 references

Concepts

TL;DR

Marine power cables are critical for cost‑effective marine energy systems, yet loading regimes for floating converters remain poorly understood because of limited field experience. The study evaluates mechanical loads and failure modes of a dynamic power cable linked to a floating wave energy converter. The authors combine tank‑test data, numerical modeling, and site‑specific wave characteristics to locate peak loads and estimate fatigue life. The analysis shows that wave parameters significantly influence peak loads and fatigue cycles for catenary and lazy‑wave umbilicals, providing a tool to assess component suitability and revealing that lazy‑wave cable conductors face critical fatigue failure risks.

Abstract

Reliable marine power cables are imperative for the cost-effective operation of marine energy conversion systems. There is considerable experience with marine power cables under static and dynamic load conditions but the loading regimes for floating marine energy converters are not well understood, due to a lack of field experience. This paper aims to assess mechanical load conditions and failure modes for a dynamic power cable that is connected to a floating wave energy converter. The applied approach combines experimental tank test data with numerical modelling and site-specific wave characteristics to identify maximum load points and to quantify the fatigue life. The effect of varying wave parameters on maximum loads and fatigue cycles is investigated and results are presented for two common umbilical configurations: catenary and lazy wave. In situations with limited field experience, the presented approach provides a tool to determine if critical components are fit for purpose and to assess the expected level of reliability prior to deployment. The cable conductor’s fatigue life is estimated for the lazy wave configuration and highlights component fatigue failure as a major concern that must be addressed in floating marine energy applications.

References

13