Proceedings of the 2005 Particle Accelerator Conference · 2006 · 10 citations · 1 references
EngineeringElectrical EngineeringNuclear EngineeringPlasma PhysicsRadiation PhysicsRadiation TransportAccelerator ArchitectureAccelerator PhysicsCollider PhysicsElectron Beam PhysicsPulse ProcessingAcceleratorsElectron AcceleratorsHadron AcceleratorsLepton Collider Physics
This paper describes the high-field studies on accelerator structures conducted at the X-band Test Facility, XTF, which was commissioned at KEK in 2004. A 60cm-long structure built at KEK has been processed in 2004-2005, with an accumulated operation time with the RF turned on of ∼ 1000 hours. The RF breakdown rate of this structure at 65MV/m with 400nsec flat pulses was initially measured to be ∼ once per 0.2×10 <sup xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">6</sup> pulses, and decreased to ∼ once per 0.7×10 <sup xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">6</sup> pulses with the processing. This latter breakdown rate satisfies the stability requirement for use of such accelerator structures at the linear collider. The high-power performance of two more 60cm structures will be measured in 2005. These studies are expected to provide benchmark performance data of accelerator structures in both high-gradient and medium-gradient operations, such as those envisaged in applications to compact X-band accelerators.
1
Normal-conducting rf structure test facilities and results
C. Adolphsen · 2004 · 46 citations