Proceedings of the 2005 Particle Accelerator Conference · 2006 · 16 citations · 1 references
EngineeringNuclear EngineeringSystems EngineeringNuclear ControlNuclear InstrumentationReactor PhysicsAccelerator PhysicsAccelerator ShieldingNeutron DetectionNeutron Flux ControlReactor InstrumentationReactor Protection SystemsAccelerator ControlsReactor Control InstrumentationReactor Control Systems
The design and production of the Spallation Neutron Source Linac Low-Level RF control system is complete, and installation will be finished in Spring 2005. The warm linac beam commissioning run in Fall 2004 was the most extensive test to date of the LLRF control system, with fourteen (of an eventual 96) systems operating simultaneously. In this paper we present an overview of the LLRF control system, the experience in designing, building and installing the system, and operational results.