An application of cyclical master production scheduling in a multi-stage, multi-product environment

Frank Van den broecke, Hendrik Van Landeghem, El‐Houssaine Aghezzaf

Production Planning & Control · 2005 · 16 citations · 9 references

Concepts

Abstract

This paper presents an integrated approach to solve a multi-item lot-sizing and scheduling problem in a two-stage flow shop environment. The problem tackled stems from a real world process and the data used are the actual process information. In this production system, all items are produced in two stages. The first stage is process-oriented and produces a limited number of intermediate products. The second stage is flow shop oriented and splits up the intermediate products into a very large number of end products. The objective is to develop an integrated repetitive cyclic master production plan, minimising the total set-up and inventory holding costs of the work-in-process and end products. The problem corresponds with solving the capacitated lot sizing problem in a two-stage, multi-product environment under the additional constraint of repetitive cyclic production schedules. The model will use a level by level approach. A heuristic approach will first establish a common cycle length and production frequencies. Secondly a mixed integer linear program will define the production sequences ensuring a smooth load profile. The proposed solution approach is tested out as the main planning concept within the MPS department of a company producing photographic materials (e.g. X-ray film, graphical film). Agfa, the involved company, has a number one or two selling position in the mentioned product groups. This paper will describe the solution approach, the mathematical model and operational results after one year of practical usage.

References

9