EngineeringElectrical EngineeringCritical Infrastructure ProtectionEnergy PolicyPower ElectronicsElectricity Load ManagementPower Grid AnalysisPower ManagementPower System StabilityPower SystemsVoltage RegulationBlackout EpisodesBlackout PreventionReactive Power CompensationReactive Power ControlTransmission System Restoration
On July 23, 1987, the metropolitan Tokyo area experienced a massive blackout caused by voltage instability. In the blackout, more than 8 GW of load was lost for about 3.35 hours at most, which affected 2.8 million households. Lessons learned from the blackout have formed the foundation of voltage and reactive power control, currently adopted in the Tokyo Electric Power Company (TEPCO) network
2
The power system failure on July 23, 1987 in Tokyo
Akira Kurita, T. Sakurai · 2003 · 130 citations
Newly developed voltage security monitoring system
Mamoru Suzuki, Sanehiro Wada, Masahiro Sato et al. · IEEE Transactions on Power Systems · 1992 · 58 citations
Engineering, Electrical Engineering, Systems Engineering +15