Publication | Closed Access
A comparison among grid scheduling algorithms for independent coarse-grained tasks
117
Citations
10
References
2004
Year
Unknown Venue
Cluster ComputingEngineeringEnergy EfficiencyComputer ArchitectureComputational ComplexityComputational GridOptimal MakespanGrid SchedulingOperations ResearchSystems EngineeringParallel ComputingCombinatorial OptimizationJob SchedulerComputer EngineeringScheduling (Computing)Computer ScienceScheduling AnalysisEnergy ManagementScheduling ProblemIndependent Coarse-grained TasksReal-time Multiprocessor SystemCloud ComputingParallel Programming
The most common objective function of task scheduling problems is makespan. However, on a computational grid, the 2nd optimal makespan may be much longer than the optimal makespan because the computing power of a grid varies over time. So, if the performance measure is makespan, there is no approximation algorithm in general for scheduling onto a grid. In contrast, recently the authors proposed the computing power consumed by a schedule as a criterion of the schedule and, for the criterion, gave (1+m(log/sub e/(m - 1) + 1)/n)-approximation algorithm RR for scheduling n independent coarse-grained tasks with the same length onto a grid with m processors. RR does not use any prediction information on the underlying resources. RR is the first approximation algorithm for grid scheduling. However, so far any performance comparison among related heuristic algorithms is not given. This paper shows experimental results on the comparison of the consumed computing power of a schedule among RR and five related algorithms. It turns out that RR is next to the best of algorithms that need the prediction information on processor speeds and task lengths though RR does not require such information.
| Year | Citations | |
|---|---|---|
Page 1
Page 1