Initial test of a fast-ramped superconducting model dipole for GSI's proposed SIS200 accelerator

P. Wanderer, M. Anerella, G. Ganetis, A. Ghosh, Piyush Joshi, A. Marone, I. Muratore, J. Schmalzle, R. Soika, R. Thomas,

2004 · 25 citations · 5 references

DOIFull text

Open access

Concepts

Abstract

Gesellschaft fur Schwerionenforschung (GSI) has proposed a large expansion of the existing facility in Darmstadt, Germany. The proposal includes an accelerator, SIS200, with rigidity of 200 T/spl middot/m that utilizes 4 T superconducting dipoles ramped at 1 T/s. An R&D program including both the superconductor and the magnet is directed at achieving the desired ramp rate with minimal energy loss. The RHIC arc dipoles, with 8 cm aperture, possess adequate aperture and field strength but are ramped at only 1/20 of the desired rate. However, for reasons of speed and economy, the RHIC dipole is being used as the basis for this work. The superconductor R&D has progressed far enough to permit the manufacture of an initial cable with satisfactory properties. This cable has been used in the construction of a 1 m model magnet, appropriately modified from the RHIC design. The magnet has been tested successfully at 2 T/s to 4.38 T.

References

5