The Leading Edge · 2004 · 13 citations · 0 references
EngineeringGeologyPetroleum Engineering3D ModelingReservoir EngineeringReservoir SimulationGeological ModelingPetrophysical EvaluationPetrophysical InterpretationReservoir ArchitectureReservoir GeologySeismic InterpretationAccuracyComputation AccuracyGeologic ModelingGeological ModellingReservoir ModelingSeismic Model BuildingSeismic Reservoir ModelingThree-dimensional Reservoir Modeling
The principal problems associated with the construction of 3D models for integrated reservoir interpretation are: • the complexity of the model building process and the difficulty of iterating the process, • the time required to define the model and the computational time to build it, and • the accuracy of the geometry and correctness of the topology of the model constructed.