Improving integrated interpretation accuracy and efficiency using a single consistent reservoir model from seismic to simulation

Thomas J. Lasseter, Stuart A. Jackson

The Leading Edge · 2004 · 13 citations · 0 references

Concepts

Abstract

The principal problems associated with the construction of 3D models for integrated reservoir interpretation are: • the complexity of the model building process and the difficulty of iterating the process, • the time required to define the model and the computational time to build it, and • the accuracy of the geometry and correctness of the topology of the model constructed.