Differential Equations · 2011 · 17 citations · 4 references
ManagementIndustrial EngineeringMarkov Decision ProcessesSchedulingInfinite-horizon Markov Decision ProcessesOptimal ControlReal-time Resource ManagementResource ControlResource-constrained SchedulingTime Horizon AnalysisFinite Horizon ControlInfinite Horizon Dynamic ProgrammingInfinite-horizon ConstraintsInfinite-horizon Decision ProcessesInfinite-horizon Optimization
We consider the problem on the infinite-duration tracking of a prescribed trajectory of an inaccurately observed control system subjected to an unobservable dynamic disturbance. We construct a solution algorithm that is resource-saving in the sense that the control resources used for solving the problem for small noise values in the state observation channel are little different from the corresponding resources in the “ideal case” where the current values of the dynamic disturbance are available to direct observation.
4
Dynamic inverse problems for parabolic systems
Yu. S. Osipov, A. V. Kryazhimskii · Differential Equations · 2000 · 36 citations